From Proposal to Final Inspection
27 steps. 4 phases. One promise.
Re-roofing a commercial building isn’t a single job — it’s dozens of decisions, inspections, and handoffs. At A1 Roofing Contractor, every project follows the same documented path so owners, managers, and tenants always know what’s happening, what’s next, and why.
- 01Proposal RequestYou reach out — we scope the property and confirm a site visit.
- 02Roof SurveyOn-site review: substrate, drainage, penetrations, code review.
- 03Estimate PreparedItemized scope, system options, lifecycle cost, warranty paths.
- 04Proposal Walk-ThroughWe explain every line so there are zero surprises.
- 05Contract SignedClear terms, defined milestones — we're officially partners.
- 06Engineering & TestingUplift calcs, moisture surveys, code-compliant assemblies.
- 07Project Team AssignedDedicated PM, super, foreman — one point of contact.
- 08Start-Up PackageCOIs, contacts, permit apps, submittals — all in one binder.
- 09Added to ScheduleLocked into the production calendar with a clear start window.
- 10Sub CoordinationSpecialty trades coordinated under our roof.
- 11PermittingPermits pulled across Miami-Dade, Broward, Palm Beach.
- 12Internal Pre-PlanningLogistics, staging, dumpster, parking, life-safety paths.
- 13Warranty RegisteredGAF, Sika, Carlisle, Versico — registered before day one.
- 14Pre-Construction MeetingOwner + PM + foreman align on timeline and access.
- 15MobilizationSite fenced, signage installed, crews briefed.
- 16Safety Set-UpOSHA fall protection, edge guarding, barricades.
- 17Pre-Interior PhotosCeilings, finishes, tenant spaces — for accountability.
- 18Material DeliveryJust-in-time loads keep your property clean.
- 19InvoicingTransparent invoices tied to verified milestones.
- 20Daily InspectionsForeman + super walk the deck every day.
- 21Photo LogEvery layer, every detail — archived for you.
- 22Progressive BillingPay for verified work, never ahead of completion.
- 23Safety AuditsIndependent audits keep crews and tenants protected.
- 24Safety MeetingsDaily toolbox talks. Weekly all-hands.
- 25Maintenance PlanCustom plan presented and agreed before closeout.
- 26Closeout PackageWarranties, as-builts, photos, COIs — one organized handover.
- 27Owner Walk-ThroughCity final, manufacturer inspection, your sign-off.




