Islander Condo

Year: 2026
Value: $185,000
Deck: Concrete with Lightweight concrete on top
Duration: 20 days
Soprema Water Proofing system with a liquid based flashing.
Location: Miami Beach
Obstacles: Getting the materials up to the roof due to the very tight space for loading. Tearing old tiles and lightweight concrete and the disposing of it.

Project Details

SYSTEM

Soprema Water Proofing system with a liquid based flashing.

Location

Miami Beach

Geo Madruga, Ceo

A-1 Roofing Contractor Group

Post-Solution

As Platinum Commerical Contractors we are able to provide 20 yrs. NDL Warranty

The Tear-Off:Removing Tiles: Old clay or concrete tiles are heavy and can hide leaks. Removing Lightweight Concrete: This layer is stripped down to the main structural deck.

The New Foundation: ISO & Sopraboard

  • Thick foam boards are laid down first. These act like a thermal blanket for the building.
  • Sopraboard: This is a tough, mineral-fortified cover board placed over the foam. The Waterproofing: Double-Layer Colphene membrane.
  • Base Ply Colphene 180: A smooth, rubberized sheet is applied over the Sopraboard. This is your primary waterproof seal.
  • Top Ply Colphene 180 FR GR: A second layer is added on.
  • The Details: ALSAN Liquid FlashingTraditional sheets are hard to bend around pipes, corners, or drains. This is where the liquid system comes in.
  • ALSAN RS 273 & 762: These are high-performance, water-based liquid resins.

Request a Consultation with One of Miami’s Best Metal Roof Installers Today!

A-1 Roofing Contractor has been providing quality roofing services in South Florida since 2006.  We are GAF certified, licensed, insured and hold an A+ rating with the BBB. Call us today for more information at 786-952-5012 or simply request a quote or contact us online for non-emergency requests.